DIY installation + instructions

DIY installation + instructions Vinyl siding: DIY installation + instructions

Finish the building with vinyl siding with your own hands, having even superficial construction skills and knowing the technology of installing such material will be able to many.

It is not for nothing that this decoration method is the leader among all the others, and not just because of its beautiful aesthetic appearance, low cost, long operational life, but also the ease of installation.

Selection and calculation of components

Manufacturers of vinyl material for finishing also produce all the necessary components for its installation:

  1. Internal corners and external for corner cladding of a house with a usual length of 3 meters. To calculate the required amount, measure and calculate the total footage along the total perimeter of the corners of the building, which will be divided by 3. It is better not to use short cuts so as not to spoil the external design of the building.

  2. DIY installation + instructions The starting film has a length of 3.8 meters, and the amount is calculated by subtracting the length from the value of the house perimeter doorways.
  3. The J-profile will be required in those places where annexes are attached to the structure (length is 3.8 m).
  4. The plank that we frame the window opening (length is 3 meters) is calculated by summing the perimeters of the window opening.

  5. Ebb tide for windows is set if required.
  6. A finishing strip is required to connect the eaves to the house.
  7. H-profile to close the joints between the siding strips, mount vertically, calculating the number by dividing the value of the building perimeter by the length of the siding panel.
  8. The drain bar is installed under the window openings.
  9. The platband is installed in the role of covering any openings that are flush with the walls.

To install the siding with your own hands, you will also need a galvanized self-tapping screw with a press washer with a length of 0.3 meters. The number is required to be calculated based on the wall area of ​​the walls - 20 pieces per 1 square meter.

Details

Siding calculation

Two options are used:

  • Calculate the area of ​​the house walls, from which you want to subtract the area of ​​all openings. The resulting value must be divided by the area of ​​one siding panel.

  • Make a drawing of the house and calculate the required number of planks by the piece, and this method is more economical, since you can immediately see where the trimming will go.

At the moment on the market there is a large assortment of siding from different manufacturers. One of the best Russian companies will be Grand Line. Vinyl siding is of high quality, and this material is highly resistant to impact and ultraviolet radiation. Siding from the manufacturer Norside is gaining more and more popularity.

The material from such a company has a wide color spectrum, and it does not deteriorate, and moisture does not affect it, it will not rot, it will not rust, and the paint will not fade.

Preparation stage

The advantage of this type of material is that it does not require preliminary wall alignment. It is enough just to clean the surface from dirt or old finishes, remove protruding elements (platbands, baseboards and gutters). If cracks appear on the surface of the walls, then it will be sealed with a cement mortar to prevent moisture accumulation in the winter. By the way, wooden walls must be cleaned of fungal colonies and mold and treated with a deep penetration primer with the addition of an antiseptic.

The surface on which the cladding material is installed must be completely dry, and this requirement is set by the siding installation technique.

Installing the crate for siding

Do-it-yourself installation of vinyl siding is convenient from video, and the crate is made according to the following principle:

  1. When laying siding horizontally, the aluminum or wood profile must be filled vertically.
  2. Bars made of wood should be with a cross section of 2 to 4 cm. A galvanized profile lathing will cost 30% more, and it will also turn out to be more durable and reliable.
  3. The distance between the profile (that is, the bars) must be 0.

    3-0. 3 meters, and they must be set under the level.

  4. First, drive the guide into the left wall corner, and then the load-bearing tracks horizontally from below, following vertically in the right corner. Additionally, you need to tie all openings.
  5. When creating the lathing, take into account the location of gutters, lamps and other communications.

    This requires installing additional guides on the crate.

  6. Attach the frame to the walls with dowels (if the walls are made of shell rock, brick), self-tapping screws (wood surfaces).

Now let's look at how to insulate the crate.

Waterproofing and insulation measures

Insulation (mineral wool or foam) must be placed in the crate. The main thing to consider is that it is important to leave space for the ventilated space between the surface of the walls and the cladding material in order to prevent putrefactive processes.

On top, the insulation must be covered with a hydro-barrier, and also installed vertically or horizontally with an overlap of 0.1 meter. The waterproofer must be attached to the crate made of wood with a stapler, and the joints can be glued with tape. After taking measures for waterproofing and thermal insulation, make a frame directly under the siding. The principle of the lathing will remain the same - a metal profile or wooden slats are stuffed in increments of 0.

4 meters, and they additionally frame all openings.

Installation Instructions

Installation of vinyl type siding implies the following sequence:

  • Installation of corner strips ...
  • Fixing the starting bar.

  • Installation of J type profile for finishing the siding edge.
  • Decorations near window openings.
  • Siding paneling.
  • Installation of the finishing strip.

DIY installation + instructions The starting bar is installed along the perimeter of the building, it is required to set it as best as possible.

Fastening by means of self-tapping screws with a pitch of 0.3 meters is used, while perpendicular to the surface. The fastener is screwed in exactly in the middle of the oval-shaped hole so that the material does not bend.

The main thing is that the self-tapping screw does not fully enter the bar, namely, between the siding and the hat there was a gap of 0.1 cm (for convenience, put a coin).

In the middle of the joining of the two starting bars, a clearance of 0.5-0 is needed. 7 cm. Door and window openings, which are in the same plane with the wall, are sheathed with a wide platband, into which the siding is brought.

If there are slopes, the decoration is reduced to siding by means of a corner profile.

First, it is required to clad the lower slope (if there is an ebb), and then the side slopes with a shift to the center of the opening to prevent the top panel from coming out of the clutch in the winter season, and at the end of the upper one.

During installation, the siding panels must fit into the starter bar and snap into place. After that, the material can be fixed with hardware, and the fastening of the cladding material takes place under constant level monitoring. For convenient, you can pull the rope. The finishing strip must be attached at the top under the roof itself, and then measure the value from it to the last siding panel.

The tailored strip will bend in an arc and start under the finish-type panel.

Cost of installation

The price of installation work on siding finishing depends on the following factors:

  • With or without insulation.
  • Depending on the building material (wood or brick).
  • The number of window and door openings.
  • The cost of raw materials, including the creation of the lathing, waterproofing, insulation and type of fastening.

The video is worth seeing how to install vinyl siding with your own hands.

.