Do-it-yourself siding of a wooden house + Step-by-step instructions

Do-it-yourself siding of a wooden house + Step-by-step instructions Do-it-yourself siding of a wooden house + step by step instruction

Renovation of the exterior timber walls of the house involves the use of additional materials throughout the area Do-it-yourself siding of a wooden house is the most practical method. In addition, siding is a popular and affordable material and will look very beautiful in terms of aesthetics. Consider step by step how to choose the right material, calculate its quantity and carry out installation work.

Selection of material. The correct selection of materials will affect the entire structure in general.

Manufactured siding will be available in a variety of colors and textures.

It is required to get acquainted with the information about him, and also find out information about the invoice. First, before choosing it, you need to decide on the final look and shade of the planned house. A composite choice of textures and color solutions is also possible. Next, choose the siding according to the planned effect.

Industrial enterprises are created in several types with a length of 2.5 to 4 meters.

Overview of materials

Plastic

Advantages:

Disadvantages :

  • Susceptible to mechanical damage.

Consider other materials.

Metal

Advantages :

  • Durable.
  • The service life is quite long (ideally, it should be bought from authorized dealers who guarantee long-term corrosion free).

Cons :

  • It is necessary to carry out rust protection from time to time.

And the next tree is.

Wood

Advantages:

  • Supplements the properties of the initial wall material.
  • The veneer is environmentally friendly.

Disadvantages :

  • Quite high cost.

And one more option.

Fiber cement

Pros :

  • Non-combustible.

  • Has a high degree of strength.
  • Variety in style, color and texture.

Next, you need to select the crate. It can be divided into 2 types:

  • Galvanized metal, which is not subject to temperature extremes 5 * 5, 6 * 2. 7 cm.

  • Wooden.

The metal profile is most suitable for surfaces with different unevenness. They are very strong to support the weight of any decorative cladding. Metal profiles are chosen with different sections. Costs are reduced when engaging in timber frame work, because there is no need to protect the section of walls in the line of contact with the battens.

The timber frame must meet the following criteria:

  • No delamination.
  • No deformation.
  • No sign of decay or stains.

Before installation, the frame must be impregnated with antiseptics, and also with fire retardants in order to create a protective fire layer, a coating against mold or mildew. You need to choose the size of the bar 4 * 4, 5 * 5 or 5 * 8 cm.

When performing work with your own hands, you first need to find out as much information as possible on this topic.

Details

Where to start

Completing

Sheathing of a wooden house DIY siding is important, step by step instructions will help you. First you need to consider a set of siding plates for facade cladding, so choose depending on their area and width.

Completing the wall surface cladding with siding includes:

  • The panels themselves.
  • Inside / outside corners.

  • the starting profile located 1st from the base.
  • H-, T- and J-profile.
  • J chamfer.
  • Cash for 7.5 and 8.

    9 cm.

  • Solid soffit.
  • Window profile.
  • Low tide
  • Finishing profile.

Additional decorative elements will help to make the exterior of the house beautiful and complete.

How to calculate the number of siding elements

It is required to measure the length of the building foundation, width, using a construction tape. Based on such measurements, it is worth drawing up a sketch of a house with a drawing of the required materials and additional elements, notes about their number and sizes. Choose building elements so that they are from the same manufacturer, because parts and main material that are made at different enterprises may not be suitable.

Number of panels

How to calculate how much siding is needed? The number of planks can be calculated by dividing the total area of ​​the walls by the width and length of the element. It is important to buy the material with a margin of 10% of the total received number.

Number of corners

To calculate the number of inner and outer corners, you need to measure the height of all protruding and concave lines of the building. It is best to count the number of planks separately for each corner, and you should take geometric shapes as a basis.

The total length of the start strips

The finishing and starting plates must correspond to the length of the house side.

Calculation of the remaining elements

It is important to calculate J-type panels and window strips based on measurements of the perimeter of doors and windows. It is required to take into account the window profiles.

Complete instructions for installing siding

Siding a wooden house begins step by step with the preparation work.

Preparation

If you have an old finish, it needs to be dismantled. The base of the walls must be cleaned from dust and dirt. After that, it is important to treat the cleaned surface with an antiseptic, and also a fire retardant in order to prevent it from external influences (and atmospheric), as well as early destruction.Additional materials and tools are required for the installation of the frame:

  • Building corner.

  • Construction type stapler.
  • Insulation
  • Wind protection and waterproofing.
  • Wood screws.
  • Sealant that does not expand in air.

Before fixing the frame, make sure that there is no damage or places with unstable elements on the wall.

Installation of the frame

The distance in the middle of the guides must be calculated taking into account the thickness of the insulation layer if it is used. The guides need to be fixed to each other at a certain distance, which is equal to the width of the insulation layer minus 2 cm, approximately in increments of 0.4, 0.5 or even 0.7 meters.

When using polystyrene, the fastening step should be chosen exactly in accordance with the width. In general, the pitch of the frame will be determined by the length of the siding panel. To fix the material in a horizontal position, for example, on the section of the upper facade of the house part, the frame must be positioned vertically. Conversely, for vertical placement of the decor, the crate will be installed horizontally. Fastening the frame is required to start from the corners of the house facade.

Around the windows, you need to secure the path guides. The slatted length should not reach the bottom of the wall at a distance of 0.5 meters. For the correct use of any materials, it is important to read the instructions supplied by the manufacturer. Here are the step-by-step instructions for attaching the siding frame:

  1. Do-it-yourself siding of a wooden house + Step-by-step instructions On the surface of the walls, it is required to install a special construction vapor barrier membrane using stapler strips with an overlap of 0.

    1 meter. It will create movement of air currents through the wall. To fix it, I use double-sided adhesive tape.

  2. Direct mounting of the rails, and it is required to check the evenness with a building level.
  3. Next, lay a layer of insulation, if any, in the opening between the guides.

  4. On top of the insulation when applying it, attach a layer of special wind protection, as well as waterproofing. Better to use vapor diffusion windproof materials.

It is important to use nails that are treated with an anti-corrosion zinc or even aluminum compound, as well as self-tapping screws in order to fix the frame.

Fixing the profile (starting)

It is important to check all the steps during installation of each panel for the exact vertical or horizontal position using the building level.

  1. Mark the lower point of the crate at a distance of 0.

    5 meters by mounting a loosely fixed self-tapping screw or by another method, and also place it further along the contour of the building for further fastening the siding itself along them. It is important to check the accuracy of the horizontal in all places with a building level.

  2. The cord (construction) is pulled along the lower dimensions along the self-tapping screws, which are set at a level of 0.5 meters from the ground or base.
  3. Next, it is important to mark the fixing points on the laths of the corner profiles.

    To do this, it is important to apply the profile to the slats, which are located at the house corners.

  4. It is important to fix the starting profile at the mark with a rope, retreating 0.6 cm from the planned joint with the corner type of profile.
  5. Fasten the next first planks 1 cm apart in order to prevent further deformation from external temperature changes.

When the first or starting strips do not have any gaps from the corner profile line, nail strips will be cut on it.

When joining the profile, it is important to cut the upper part so that there is a gap between the nail panels of 0. 9 cm. The overlap is created at 2.5 cm. When the work is finished, check the accuracy of the position of the starting plates using the building level.

Corner profiles

Do-it-yourself siding of a wooden house before fixing, the corner profiles of the outer and inner corners will be attached. The step-by-step instructions are as follows:

  • Mark the extreme points of the location of the filing material, an area near the roof - soffits.
  • Apply guides to the corner of the building facade.
  • Mark the gap between the roof line and the edge of the profile at 0. 3 cm.

  • At the bottom, fix the profile 0.6 cm lower than the line of the starting punk, forming an overlap. From the front plinth, the profile is mounted higher with a gap of 0.6 cm and fixed on self-tapping screws in the upper part.
  • Check the vertical with the building level and adjust the panels if necessary.

  • Attach the remaining center and bottom to the screws, avoiding permanent placement of the screws.

Between the cornice and the end face there should be a gap of 0. 3 cm. The joints with the profile are created at the same distance, measuring at all corners of the building. Further docking is done with an overlap, and trim off the section with the mounting holes that refer to the top of the plank if necessary.

Create a space of 0.9 cm from the top and between the bottom panel. In order to cover the docking points, an additional strip is needed. Similarly, install the concave corner profiles, and the corner-type profiles can be replaced with starting ones.

Framing openings

Work with openings has an increased level of complexity.

It is important to determine how the opening is located relative to the walls - flush or recessed. Flush procedure:

  1. Apply waterproofing along the contour of the window (required).
  2. Fix the J-profiles or trims - 2 horizontal and 2 vertical.
  3. Connect the profiles - you need to bend the created bridge-notch at the top of the profile in order to divert atmospheric precipitation. Remove excess material.

  4. When joining the side profile with the upper bridges must be inside.

The work is carried out in the same way with a "drowned" opening,

Installation of the first panel

Work starts from the less visible side of the house. insert the first panel with the locking part of the corner type profile. It needs to be snapped in, creating a distance from the lower locking section to the starting element, so that there is no distortion of the siding when the expansion appears from the influence of temperatures. Next, the first bar must be fixed to the frame with self-tapping screws.

Do not tighten the self-tapping screws until they stop so that there is no deformation of the siding panels when exposed to temperature expansion. They are placed in the central part of the site with holes for attaching siding perpendicular to the walls.

Installation of the remaining panels

Install further panels either overlapping or using an H-profile. When installing siding "overlapping":

  • It is required to shorten panel locks and frames for fastening. As a result, the "overlap" should be 2.

    5 cm.

  • Gaps are made with a size of 0. 03 cm from the soffit edge and 0. 06 cm from the start panel.

Installation of H-panels is carried out in a similar way.

In the areas of openings, the excess part of the plank is trimmed. Under the roof, sheathing with metal siding panels is carried out taking into account the measurement of the distance from the bottom finishing lock and the section of the penultimate plank. Add 1-2 mm to this number. This is the width of the last siding strip. Prepare the last part, and you need to mark and cut it at the top, and also make hooks every 0.

2 meters. To do this, make cuts and bend to the side. Insert the last panel into the finish profile lock, and then click it into place.

.