The word "barn" in translation from Turkish means "palace". In our understanding, we are talking about a free-standing auxiliary building, which is mainly intended for household needs. The need to own such a room makes you think about how to cook a shed from a profile pipe with your own hands, and quickly and at minimal cost.

We suggest you build a shed with your own hands, without involving craftsmen, that is, on your own, using profiled metal as a material for the roof and walls.

How to calculate the cost of a shed from a profiled sheet

We will build a shed not on a site that is unprepared and with our own hands, which means that only the price of materials needs to be included in the estimate.

For a shed made of profiled flooring, you need:

  • How to build a shed from a profile pipe with your own hands Skates, corner strips.
  • Hardware for fastening and profiled flooring.
  • Insulation material.
  • Electrodes.
  • Profiled pipe for installation and cross-roofing.

  • Supports for fixing the profiled sheet.
  • Sheet metal.
  • Crushed stone, cement, sand, metal rod or reinforcement.

For installation we use the usual tools:

  • Accessories for measurement.
  • Welding machine.

  • Electric scissors, screwdriver, drill, impeller, and rivet attachment.
  • Concrete mixer.

The main part of the costs is occupied by two positions - corrugated board and shaped pipe. For the wall device we use the most economical version of the front flooring - Bulat 10, and for the roof Bulat 35. Profiled metal is selected according to the following parameters:

  • Type of polymer coating, color and thickness.

  • Profile height.
  • Sheet thickness.
  • Zinc content.
  • Purpose (for roof or facade).

Ideally, the following material will suit you:

  • For walls Bulat 10 with a thickness of 0.

    04 cm with a polymer coating, in the color RAL 7024.

  • For the Bulat 35 roof with a thickness of 0.045 cm with a polymer coating, in the color RAL 7024.

A profile pipe is required in the size of 4 * 2 cm, for connecting frame elements and 8 * 8 cm for the base ..

. The price of other materials is 20% of the basic costs.

Details

Building order

Profiled flooring has many parameters that allow it to be used in the construction of structures, but there are limitations that must be taken into account in the design, even if you are building a barn. The sketch needs to be drawn so that the slope is at least 15 degrees. The plumb lines of the roof protrude 0.

3 meters beyond the wall perimeter. The entrance is equipped with double-leaf profiled gates opening outward. The barn should have natural ventilation.

Supports and foundation

It is required to start the process by leveling the site, as well as removing a layer of earth with a thickness of 0.15 meters for clay soil and from 0.

15 to 0. 3 meters for black soil. Mark the perimeter and dig trenches along it for the strip base. The structural weight is low and the load is distributed along the supports, and therefore it is not necessary to make a deep foundation, since its main role is to waterproof the room. How to make a shed from a profile pipe?

In a dug trench at the places where the supports are installed, make holes with a depth of 1 meter, install in them previously prepared supports from a profile pipe from the side of the wall 8 cm.

Weld to one end a sheet metal heel that is 0.3 * 0. 3 meters. Insert the supports along the plumb line and trench axis. For fundamental reliability, connect the supports with a rod, attach to the posts with wire.

Place formwork from boards with a height of 0.2 meters above the level of the desired floor and fill with concrete. The composition is required to be prepared in a proportion of 1 measure of cement M400, 3 measures of sand and 3 measures of crushed stone. The foundation is ready for future work a week after pouring, and in order not to waste time in vain, you can make a concrete floor screed. Then we move on to frame installation.

Installing walls and roof

Cut the pipe for lateral fixing. Weld between the supports so that there is only a single plane along the facade. The profiled sheet on the outside is required to be laid solid, and on the inside in sections that will create supports. Connect the upper ends of the supports along the common perimeter, put a pair of logs in each section, if the height is up to 2.5 meters, or three sections, if the height is greater.

After the welding process for the wall frame, go to the roof. Using the beams, connect the opposite supporting ones, which are installed along the length of the shed. Use a pipe 8 * 8 cm if the spans are more than 3 meters, and 4 * 4 if less. Choose the main length of the beam so that it protrudes from the perimeter of the shed by 0.3 meters on each side to form an overhang.

In the center of the span, weld vertical types of racks, which form the required slope in height. The calculation is required to be done for a right-angled triangle through the leg, which is known (1/2 the length of the beam or the width of the shed, taking into account the overhang) and the required angle.

Attach the uprights to the ends of the beams to create a rafter leg. The truss needs to be reinforced with reinforcement ties, and cut the rod in such a way as to fasten the right corners to the rafter, dividing it into two halves. After the second segment, connect the previously welded pieces to the beams.

Install transverse braces, which will serve as a crate at a time. Use a profile pipe 4 * 2 cm long, which is equal to the roofing length. Connect the beams with such elements. Weld the overlap braces on top. The distance between the rows should be 0.

5 meters, and to such elements it is possible to attach the roofing material from the profiled decking after the installation of the waterproofing film.

In the role of the pediment frame, we will use the extreme trusses, and for this it is necessary to replace the reinforcing reinforcement with a rafter into 3 equal parts and mount the vertical types of jumpers between it with a beam (horizontal). Racks are required to be made from a 4 * 2 profile pipe, and then the entire structure needs to be painted. To protect against moisture and condensation between the rafters, we roll out the roofing film. Start from overhang to top.

We set each new layer with an overlap. Determine the sheet length of the corrugated board by the length of the roof slope. To do this, order sheets of the required length from the manufacturer, and the first sheet is laid with a ledge on the pediment. Further overlap.

Screw to the bottom wave by means of painted self-tapping screws for metal (screws with a length of 2.

5 cm) with rubber seals. Tighten the screws strictly perpendicular to the cross members so that there is no distortion and, as a result, roof leakage. Another extremely important detail is the optimal screw tightness of the self-tapping screw. Excessive pressure from the self-tapping screw can cause damage to the corrugated board coating and further corrosion. In the event of a poor fit, this encourages moisture ingress.

Install the ridge and screw into the upper wave with self-tapping screws. Use screws with a length of 7.5 cm, and all screws must be installed after one wave, and then go to the pediment.

It is required to cut the sheet in an angular shape using electric scissors. It is required to lay horizontally, and then start work from below.

Attach everything with self-tapping screws to the vertical truss posts from the edge. Install the next sheet with an overlap, and screw the corner profile to the roof covering, which helps to keep the sheet in case of a wind gust. Attach the ridge as well by screwing 7.5 cm screws into the upper wave from the side of the gable and roof.

Installation of a profiled sheet from the inside and front of the barn

According to the drawing of the barn, the first thing to do is to install the facade from the shaped pipe.

Place the sheets vertically, and the first one is placed from the corner. Screw everything to the crossbars, and the next overlap by one wave. Connect the corner types of sheets using a special profile strip. Screw the profiled flooring into the lower wave, and the corner into the upper one. Self-tapping screws are required to be screwed through the wave into all crossbars.

Proceed with interior decoration, initially installing insulation.

Use 4 cm thick foam sheets, cut to the dimensions of the sections obtained by the uprights and crossbars. Attach to the back of the installed profiled sheet with adhesive tape or double-sided tape. The same insulation is laid under the roof in the sectors that are formed due to stretch marks and rafters. Finally, attach the foam to the stretch marks by means of the lathing lathing.

How to build a shed from a profile pipe with your own hands Next, let's move on to the interior decoration. You need to install between the supports, since such elements can be used for a shelf device, fasteners of various devices and more. The ceiling needs to be sheathed in the same way, using the braces that were previously installed on the beams to fix it.

The profiled decking is attached in the same way as on the facade. The cut needs to be made in length using metal scissors.

screw with self-tapping screws overlapping on the same wave. We carry out electrical wiring along the profiled sheet in sleeves or protective boxes. For installation, we use clamps for the profiled sheet, and then proceed to the creation of a swing gate with two leaves.

Shed gates made of profiled sheet

The fastest manufacturing method is to form a structure on site. What does this mean? The gate is made in the following sequence:

  1. Between the supports below and above, install by welding a pair of jumpers with an indent from the base up to 5 cm.

  2. Connect the installed jumpers with four posts, two of which should be located close along the supports, and a couple more along the portal axis.
  3. Weld the hinges to the supports and a pair of posts.
  4. Use a cut-off grinder to cut the horizontal bars in six places. Between the posts, which are fixed along the axis of the goal and between the supports / posts, on which the hinges are welded. Bring the cut points to a single plane with the racks and grind.

    This will create two leaves with mounted hinges.

  5. Weld the padlock lugs onto the B-pillars, then paint the structure.
  6. Install the profiled decking - take a couple of sheets and cut out the slots for the lock. Install the first sheet on one sash, starting from the rack, and the other on the second so that it overlaps, then install the rest of the sheets.

When installing the inner cladding, it is not necessary to overlap the sashes.

The perimeter of the gate must be pasted over with a seal. Attach the material to the profiled flooring with the adhesive part so that it protrudes by the amount of compression.

Recommendations for the choice of material

Any person expects all buildings to be reliable and durable. For this reason, I choose a profiled sheet for garages, sheds and other outbuildings. It serves up to 40 years and is inexpensive (but much depends on the quality).

By the way, there are materials at different prices for a barn from a profile pipe. The choice will depend on the construction budget, and here we can advise you to look for the best value for money. But experts do not recommend buying profiled flooring with a low zinc content (less than 0.18 kg per square meter), and it is impossible to distinguish visually. For this reason, it is required to require a metal quality certificate from the manufacturer.

Also, do not use corrugated board made of steel with a thickness of less than 0 for the roof.045 cm, and 0.04 cm for fences. Finally, never use wall material instead of load-bearing (roofing) material.

.