Repair school - DIY bathroom and toilet: Instructions + Video

Repair school - DIY bathroom and toilet: Instructions + Video Do-it-yourself repairs in the bathroom and toilet? To start repair work in the apartment, according to most decorators, it is imperative to start with the bathroom and toilet. It is easy to explain - this part of the repair is the most dusty and dirty, and not only the dismantling of old plumbing fixtures and tiles and doors is required, but in some cases even doors!

We propose to consider step-by-step instructions for repairing a bathroom and toilet, as well as finishes.

Down with all the old stuff!

Plumbing. So, the first step is to take out all the old plumbing, namely the sink, bathtub, toilet bowl - in general, everything that lies, hangs and stands. After that, you can proceed to the next one - using a grinder, cut off the old pipes to the crane, which is located on the riser.

Using a punch, it will be easier to knock down the old tiled covering, and it is important: if the plaster, which is under the tile, moves away from the wall, it must also be beaten off.

Repair school - DIY bathroom and toilet: Instructions + Video The door is now . Surely, with a major repair, you will change everything, including the doors. Remove the old pattern together in the door frame. Sewerage is also important, so you should pay attention to the sewer and water riser.

In any case, such parts should be changed during repair, since low-quality pipes can ruin expensive repairs. In addition, at the end of the repair work, it will be problematic to change the risers.

If you are not an expert in plumbing work, then in order to replace the risers, you should invite good masters with high qualifications, and everyone can do the internal wiring of the water supply without outside help.

Don't forget the cooker hood . If you don't want the bathroom to be stuffy, you should check how well the ventilation system works.

To do this, bring a burning candle to the hood and evaluate its performance by the movement of the flame tongue - the better the exhaust system functions, the more the flame will be sucked into the pipe. If the hood does not work properly, it should be additionally cleaned, or you can install a fan.

Preparing the floor and walls

It's scary to think about how much it costs to repair a bathroom and toilet both in Khrushchev and in large apartments, but if you don't follow technology, the results may not be encouraging, and not only will you not be able to save money, but you will have to pay extra. For this reason, we recommend that you do not give up priming the walls. First you need to clean up well - sweep all the debris and dust with a broom, and after everything settles, you can take a primer with deep penetration and start priming the walls.

Also, do not forget that beacons should be installed. After complete drying, beacons should be installed for the upcoming finishing work. We install the lighthouses strictly according to the level, while it is important to observe the plane of the wall and maintain each angle by 90 degrees.

So, after the beacons are installed, you can start plastering

This requires a spatula, a drill attachment of the "mixer" variety and the drill itself. The bathroom is usually plastered with dry gypsum mixtures, fortunately, there are more than enough of them on the market.

Take a bucket of material with a volume of 12 liters and start preparing the solution according to the instructions. Next, using a spatula, throw the solution between the beacons of one wall 0.5 meters from the floor. After that, we take the rule, press it against the beacons and stretch it up to get a flat surface. We remove the surplus that remained on the rule.

We do the same on all the walls - we start from the floor and pull towards the ceiling. If there are small pits left, this is not a problem - everything can be leveled with a spatula. If everything turned out smoothly and beautifully the first time, then you did it perfectly well!

The next step is leveling the floor

This can be done done using self-leveling floor technology. To do this, dilute the mixture according to the instructions, you can even make it a little thinner, and stretch the mixture over the entire floor area using a roller with needles. After drying, the floors and walls are checked for level, in case of deviations, eliminate the unevenness.

If you want to make a turnkey bathroom and toilet renovation, it would be wise to make a detailed bathroom plan. it will include a well-thought-out design, and it will already be clearly defined where, at what height and how the mirrors, washing machine, bathtub, towel dryer, toilet bowl and pipe box will be located.

To do this, take a tape measure and measure the bathroom, because after plastering the dimensions will change. After that, take a sheet and a pencil and draw a sketch that will be a blueprint. In order for the plan to be fulfilled with all the accuracy, you should buy in advance everything that you are going to install.

Please note, that if the bathroom is tied to certain dimensions, then choose the container as long as possible. Even if the size of the room is 1.67 meters in one direction, and the bathroom is 1.7 meters, buy it, since the missing 0.03 meters can be screwed up.

Sketch the detailed layout of the sewerage and water supply system

If you bought everything in advance, you can continue. Assemble the bathtub in another room, place it on its legs and level it. Most often, in many modern bath models, you can adjust the height for yourself. Measure the width and height of the tub. Then transfer the dimensions to the wall near which it will be installed.

We do the same with the washing machine and sink.

Next, you need to make markings on the wall so that it is clear how the sewerage and water supply will go

It is better to install the bathroom faucet in the center 0.1 meter higher bathroom and this should also be noted on the wall. The distance between the pipes that go to the bathroom faucet should be 0.15 meters.

Make a markup of the sink water pipe based on the design features of the cabinet and the length of the flexible hose. We mark only one pipe under the washing machine - cold. Sewer pipes should be sketched at a certain angle towards the riser to make a drain. If a slight slope can be made under the sink and bathtub, then the outlet under the washing machine should be at a distance of 0.5 meters from the floor.

Now we move on to the next type of marking, namely for electrical wiring

Repair school - DIY bathroom and toilet: Instructions + Video This step is very important, and how many outlets there will be and in what places will depend on the location of the same washing machine and according to your wishes. If you use an electric shaver, you will need an outlet near the mirror, and if the mirror is illuminated, you will need to run an additional wire for it. If you have a fan, take care of its power supply. You should also make grooves, but after all the markup is ready. It is required to take a puncher and groove everything that is required along the intended line, and then do the cleaning and prime the grooves.

Install plumbing and plumbing

At this point, install the plumbing and plumbing system. Also, do not forget to install filters and water meters. Since our water supply is removed into the walls, it is better to use polypropylene pipes or metal-plastic pipes. After that, you can install a heated towel rail. Here you need to invite masters or do everything with your own hands.

Pipes should also be installed in the wall.

Installation of the duct is required as a way of masking

Since we still have some open risers, this should be corrected. Assemble the box from the profile (metal) and sew it up with drywall. Be sure to choose a moisture-resistant type of HA, that is, green. Also, do not forget about how to make a technical hatch, which is required to access the meters and taps.

After that, place a perforated corner on the corner of the box and you can plaster the entire box. And back to the primer again. At this stage, you will have a completely plastered bathroom and toilet, with no visible wires or plumbing pipes. It is still required to once again inspect well for irregularities, and if there are any, fix everything with sandpaper and a spatula.

Finishing work

It's nice to look at the photos of the repair of the bathroom and toilet, if everything has already been done in them.

To make your bathroom look as good as possible, tiled the floor. This will require a mixer, drill, bucket, spatulas (regular and notched), as well as a tile cutter and crosses. The tiles should be laid out in such a way that all the cut edges are under the sink and bathtub, and then only solid tiles will be visible in a visible place. Also, don't forget to use crosses and a building level. Wall tiles should be laid out from the floor under the bathroom.

After that, you can lay 1 row of wall tiles under the bathroom - this is required to create waterproofing. If you use small tiles, then 0.3 meters from the floor will be enough.

After that, you can grout the tiles under the bathroom and proceed directly with the installation. Bring the bathroom into the room and set it strictly according to the level, and then you can start expanding it.

Now it has become quite a bit - to lay the wall tiles. You need to start with the bath itself, from a prominent angle, and then drive in a circle. From the sides, the bathrooms should be attached to the slats so that the tile goes along the level. When the top is over, remove the slats and fold down, and also let the tile dry, and you can remove the crosses.

It remains to clean and wipe the seams, and you can proceed to the ceiling.

Here you should decide what you plan to do with it. If there are several ways - you can plaster and paint, or make a tension / suspended structure. Each option is good in its own way, you choose. And the last thing is door installation. First, install everything that you didn't have time to - a washing machine, a sink, faucets, a toilet bowl and a tap under the bathroom, and then hang up a mirror, put in sockets and install a door.

This order of work will not allow you to make mistakes in which the quality of work may suffer. Good luck with the repair!