What to do first - laminate, stretch ceiling or wallpaper: Review + Video

What to do first - laminate, stretch ceiling or wallpaper: Review + Video What to do first - laminate, stretch ceiling or wallpaper. Where to start repairs? And what to do first - walls, floor or stretch ceiling? Also, you are probably concerned about the question of what materials should be selected, in what sequence to carry out the work and how to avoid mistakes. Such questions are the most common and frequently asked if you decide to repair, including altering the ceiling. You will find the answers to all the questions listed above in the content of the article.

So, the most important thing in the repair is a clear sequence of work, since otherwise you will be provided with headaches and chaos.

If you decide to install stretch ceilings, then this is great and worth it, but there are some points that you will have to consider. The structure of the false ceiling itself is not too complicated and can be done at any time. But if you plan to make a partial or major repair in a couple of years and replace the floor covering or paste over the wallpaper, then this will have an extremely negative effect on the new ceiling covering.

What to do first - a canvas, walls or a floor

You can install a stretch ceiling in the midst of a repair, and when it is over. The most important thing is that by the time the ceiling is installed, all the rough work (finishing, leveling the floor and walls, ceiling plaster) has been completed.

There are many disputes and disagreements on this topic, but in fact there are two ways to mount the ceiling, one before wallpapering the walls, and the second after.

Ceiling installation method before wallpapering walls

What to do first - laminate, stretch ceiling or wallpaper: Review + Video The undoubted advantages of this option is that during installation work there will not yet be a covering of wallpaper, or rather, you will not be able to spoil them (smear, dust, scratch with a puncher, etc.). The disadvantages of this option are that there is a masking tape that is installed on the new wallpaper around the entire perimeter, and since it is not there, you will have to glue such a tape yourself or additionally call the master. The decoration of the joint, where the ceiling ends and the wall begins, is carried out as follows - they take a wall corner, which is used to cover the gap formed between the ceiling and the wall.

Method of installing the ceiling after gluing the wallpaper

The advantages of the method are that the workers will install the masking tape themselves, quickly and beautifully. Of the shortcomings, it is worth noting that there is a possibility of damage to the wallpaper when installing the ceiling. As you can see, the issue is really controversial. It can be considered unambiguous that by the time the walls are wallpapering and the ceiling is installed, the rough work must necessarily be completed. This will help keep dirt and dust out of the surfaces you've refurbished.

If you think soberly, then the ceiling is made for a minimum of 10 years, but you can re-glue the wallpaper more often.So do not worry, you will be able to stick the canvas neatly and clearly withstand the joints. Most builders try to stick to the scheme when they first make all the horizontal lines (floor and ceiling), and then the vertical lines. Now about the sanitary facilities. Until the suspended ceiling is installed, the tile must already be on the surface of the walls.

it is important that there are no voids in the top row of the installed tiles.

Details

In general, about the repair

The main task of the repair is to transform the premises and make it more convenient , more comfortable and modern for creativity and life for yourself and your family. So that in the future repairs do not associate you with a real disaster or natural disaster, so that everything is smooth, beautiful and fast, you should properly organize the process, as well as observe the order and technology of work.

Repair can be:

  • Cosmetic, which includes replacement of coatings.
  • Capital, when you plan a complete redevelopment of the premises, replacement of all worn out communications and electrical wiring, interior decoration.

What to do first - laminate, stretch ceiling or wallpaper: Review + Video In turn, it is possible to repair the ceiling or install a stretch ceiling, along with all the repairs, and separately when it suits you. Believe me, even the most ordinary suspended ceiling without drawings and photographs can transform a room.

The main difficulty and peculiarity of the repair is that it is extremely labor-consuming, long-lasting and has a high cost. When performing repairs, you may need not only the help of handymen, but also narrow-profile specialists (electricians, plumbers, tiler and painter).

Therefore, if you cannot be completely confident in your abilities at the expense of work on a particular profile, it is better to immediately contact a highly qualified foreman.

Where to start repairs

So, what to do first - the floor or the walls? As a rule, after the owners have made a decision to carry out capital repairs, the owners immediately go to a large construction center and start whatever they think will be necessary, and this is the first and most important mistake. Repair should begin with a consultation with a competent specialist, as well as drawing up an estimate. To do this, you can invite the foreman to your house, discuss absolutely everything with him and discuss the subtleties of the upcoming repair. Share with him your vision - how you see your apartment after the renovation, what kind of interior it will be, what design the housing will match. Believe me, any successful renovation begins precisely with clear planning.

The sequence of all stages of repair work should be observed and clearly controlled, and then you will be able to achieve the following:

  • What to do first - laminate, stretch ceiling or wallpaper: Review + Video Spend minimum time on repairs.
  • Save as much as possible without losing quality.
  • Maximum quality work results.

Now let's talk about what should be included in the project.

What is included in the repair project

The repair project should have:

  • The layout plan, which will be obtained at the end of the repair.

  • Schematic layout of all communications (sewerage, water supply and electrical wiring).
  • Layout of technological equipment (bath, washbasin, toilet, boiler, water meter, built-in furniture, air conditioner).

Without a project, situations may arise when electricity was not supplied to the lamp, which is equipped with lamps, and the washbasin could not be accommodated due to the strongly protruding pipe riser. The cost of fixing such silly mistakes will be much more than the original project cost. You should not save on design, but on the contrary, if you follow a correctly drawn up project, you can even save money.

The main thing is that everything is thought out in advance and it is convenient to live in the apartment after the repair is over.

Overhaul plan

Preparation (7-14 days)

  • Demolition of unnecessary partitions, mezzanines, doors and other things.
  • Removal of old wallpaper, tiles, whitewash, linoleum and others.
  • We take out all the formed garbage.
  • Supply and unloading of materials.

Installation work (14-30 days)

  • Installation of partitions (at the same time, you can replace windows, if doors are required, but this is done by representatives of the seller)
  • Installation of pipes in a sanitary unit.
  • Installation of new electrical wiring and socket boxes.
  • Cementing the screed on the floor.

Rough finishing (21-35 days)

  • What to do first - laminate, stretch ceiling or wallpaper: Review + Video Installation of doors and accessories without platbands (this can be done later, but much easier at the beginning of the repair).
  • Leveling the ceiling and walls (we are talking about partial leveling, if you plan to complete it, then add at least a week).

  • Carrying out tiled works.
  • Plastering walls and ceilings.

Fine finish (14-20 days)

  • Painting the ceiling.
  • Wallpapering walls.
  • Installation of plinths, platbands.

  • Laying laminate flooring.
  • Placement of lamps, cornices and other accessories in rooms.

And now you can consider the repair in more detail.

More about overhaul

Dismantling

When you have decided what what to do first - ceiling or floor, you can start dismantling. This is the noisiest, scariest and dirtiest stage of work, especially when it comes to major repairs.

Before you start dismantling, you should talk to your neighbors about this, it may be possible to agree on the hours of the noisiest work, and promise that you will try to meet as soon as possible.

It is necessary to decide in advance about garbage disposal, to select a suitable transport in advance.From an ordinary two-room apartment, 2-3 trucks are usually obtained (a lot will depend on the volume of dismantling, as well as the capacity of the transport). Garbage at the entrance, even if temporary, can lead to the fact that you quarrel with your neighbors altogether, do not forget about it. Usually, customers underestimate the amount of garbage, which accumulates extremely quickly, and this results in a miscalculation in cost.

Discuss all the details with the contractor.

Basic Editing

What to do first - laminate, stretch ceiling or wallpaper: Review + Video It all starts with the fact that you should prepare window and doorways, as well as a balcony or loggia for glazing. The main installation also includes the laying of communications, underfloor heating, plumbing, the construction of new partitions, and plastering of walls. After that, the ceiling can be primed and painted. The next stage is the implementation of waterproofing in the sanitary facility, installation of windows, doors, glazing of a balcony or loggia.

You should not be afraid of such a seemingly strange set of work, since major repairs are usually performed by a team of people, that is, they are involved at a time to make repairs in a short time.

In addition to such workers, you will need specialists who will connect other communications - satellite or cable TV, the Internet, and install an air conditioner. Together, the cable routing scheme should be agreed. The next stage is the installation of heating radiators (if for some reason you did not want a warm floor). At the same time, you can call a measurer, who will be able to determine the places where the sewage system is located in the kitchen, the connection of hot and cold water, as well as the power supply.

After the final approval for the placement of all technological type equipment has been completed, everything will become clearer how and where it should be connected, and you can start with chipping the walls. After that, you can install the electrical and all the rough plumbing. In parallel with this, it will be necessary to lay the air conditioner route, install signal networks (Internet, TV) and install external air conditioner units.

Recently, they have often begun to lay cable communications under the ceilings, as well as hide them with a stretch ceiling. The next step will be to prepare the floor in order to fill the screed, lay damping tapes and a reinforced screed mesh.

The main installation can be considered complete after the screed is poured, but we exclude the finishing layer.

Final assembly

If you need a false wall for the renovated interior, for example, to hide the radiator or create secret door devices, this should be done precisely during the final installation. When the heating radiator is sewn up, you will be able to hide the pipes and the radiator itself, and you will also avoid that very, practically unresolved issue in terms of finishing the sanitary unit in the area of ​​joints on the border of the floor and ceiling. The boxes for sewing communications should be installed at the same time.A plasterboard box will be a very good solution, as it is often used for repairs, and it serves very well.

When everything is finished with plasterboard, you can proceed to priming, installing corners and puttying.

All surfaces sheathed with drywall sheets can be putty. When all surfaces have been processed, you should call a measurer who specializes in installing a stretch ceiling (if you are going to do just such in your apartment). At the same time, it is necessary to finish the balcony and loggias, laying tiles in the kitchen and bathroom, arranging junction points, installing a shower or bath. The final leveling of the floor is required for any major repairs, since when performing work with a similar volume on the floor, damage will still appear on the surface.

The main screed must be at least 1 cm high.

When all work on the floor has been completed, you can proceed to the last work from the final installation. This is priming (the last), finishing the surface of the walls (painting or pasting), installing a stretch ceiling, laying flooring (laminate, linoleum, etc.), installing interior doors, decorating arches and the rest.

Completion of major overhaul of the apartment

That's all, it would seem, the repair is complete.

The only thing left is the simplest and most pleasant thing - the installation of built-in furniture, including a kitchen unit, installation of skirting boards and the creation of clean electrics. In parallel, it remains to complete the installation of the washbasin and toilet, bring in the furniture, and at the very end - general cleaning.

General recommendations

Of all the following should be highlighted:

  1. What to do first - laminate, stretch ceiling or wallpaper: Review + Video Don't rush - you can't fuss in big things. Renovating an apartment is a great undertaking and should be approached with deliberation.
  2. When drawing up a project, you should take into account all sizes, write them down correctly, and do not trust technical data sheets, it is better to check everything yourself.

  3. An inexpensive overhaul with your own hands is even real, since it can be completed on your own in about 3-3. 5 months.
  4. You should consider whether it is worth contacting free workers to do the most important jobs, because they usually work without signing a contract, so in which case you will not even be able to make a claim.
  5. During the initial repair in a new building, you should not buy expensive materials for decoration. New buildings should definitely wait for the shrinkage to pass.

    Usually, the first repairs are made simple, for a maximum of a couple of years.

That's all! We hope that the article helped you and now you have enough knowledge to carry out the repair yourself.

.